Well, we’ll need to do some blasting for the water and sewer lines as well as to remove a knob of ledge along the driveway.  In preparation for the blasting, holes had to be drilled into the ledge where the charges will be placed.  You can begin to make out where the water and sewer lines will enter the building and where they will be heading once they leave the building.  Blasting is set to take place early this week!