Last week the plumbers were busy roughing in the sewer and water pipes before the foundation was covered with insulation and topped with wire mesh.  This wire mesh will provide reinforcement for the concrete once the slab is poured.  The last step before the concrete pour is to attach the radiant tubing to the wire mesh.  Heated liquid will eventually run through the tubing, which will then warm the floor and provide heat for the building.